aca-bullet accreditation-arb accreditation-cline accreditation-iip accreditation-riba burger email-box facebook-box facebook google-plus info linkedin-box linkedin mail play search telephone twitter-box twitter vcard youtube

Mast Pond Wharf


  • ClientAlbany Homes
  • Local authorityRoyal borough of Greenwich
  • Construction cost£18m
  • Statusplanning approved 2012

Towering over the Dock

The sixteen storey residential tower at Mast Pond Wharf, contains a mix of one, two and three bedroom flats with new accommodation at ground floor level for the Woolwich Dockyard Angling Club. It is clad in curtain walling and anodised aluminium and features a rooftop children’s play area. Car parking on the constrained site is provided in a green wall clad, multi-storey car park.  Low and zero carbon technologies to achieve Code for Sustainable Homes level 4 include, solar photo-voltaics and gas Central Heating Plant.

The proposed building sits between two Grade II-listed graving docks, which were themselves constructed on the site of an historic dockyard whose notable occupants include the Beagle and Henry VIII’s warship Grace à Dieu (‘The Great Harry’). An interpretive exhibition covering the site’s history will be installed at the waterside.

The development sits outside the Thames river wall, and extensive negotiations were undertaken with the Environment Agency at pre-planning stage as part of the flood wall had to be rebuilt to gain access to the car park.